A South Wales-based engineering and design consultancy firm approached Atlas Copco with a requirement for a nitrogen generation package. The equipment needed to be supplied, installed, and delivered as a "turnkey" solution within a suitable housing. This housing had to be easily off-loaded, positioned in yard space, and connected for "plug and play" operation.
As part of the Atlas Copco group, Maziak was tasked with designing and providing an engineered solution. After agreeing on the design, scope of supply, expectations, and commercial details, Maziak received the equipment from Atlas Copco and began the build at their Northamptonshire premises.
To meet the client's needs, Maziak selected a 20-foot shipping container as the housing due to its mobility, security, and load-bearing capacity. Enhancements included:
The client was highly satisfied with the delivered solution, as well as the consultancy and communication provided before, during, and after the project. The successful implementation of this turn-key nitrogen generation package demonstrated Maziak's capability to deliver complex engineering solutions efficiently and effectively.